Measurement Campaign, Munich, 10/2016 The first campaign took place in the outskirts of Munich, in the district of Dachau, Bavaria. The measurement setup and the placement of the antenna array on the trucks considered the impact of the truck container Read More …
Author: Bill Tsekenis
Measurement Campaign, Duesseldorf, 04/2017
Measurement Campaign, Duesseldorf, 04/2017 The second measurement campaign took place in Kamp-Lintfort, in North Rhine-Westphalia. The measurement equipment setup was designed in order to measure a more generic channel that is free of shadowing in T2T and T2I links. Therefore, Read More …
Measurement Campaign, Peloponnese Greece, 10/2017
Measurement Campaign, Peloponnese Greece, 10/2017 The third measurement campaign took place in Panagopoula tunnel, a 3.179 meters long tunnel located in Peloponnese-Greece. The setup of the measurement equipment was designed in a way that one can measure a more generic Read More …